Construction · 18 August 2026
Structure reaches level twenty
The concrete frame has reached level twenty, with facade installation following six floors below.
Journal

Construction · 18 August 2026
The concrete frame has reached level twenty, with facade installation following six floors below.

Landscape · 29 July 2026
A full-size planting bay is testing shade, wind and irrigation conditions before final installation.

Design · 11 July 2026
Project architect Mara Iven discusses shared thresholds, long-life materials and homes made for changing households.

Neighborhood · 22 June 2026
A measured guide to the fictional district’s market, water steps, tram stop and cultural rooms.

Interiors · 04 June 2026
The material room now includes a full-size kitchen bay, bathroom junctions and operable balcony screen.