Explore Relay & Quay

Container terminal with a cargo vessel, cranes, freight train and truck.
Container terminal with a cargo vessel, cranes, freight train and truck.

Road transport / Specialist services

Connected road and rail

Plan the connection as carefully as the longest leg.

ONE CARGO RECORD

Define the scope.

A connected movement joins modes whose schedules, equipment and handover rules may differ. The Hamburg–Gothenburg exercise is a hypothetical road–rail–road planning chain, not a representation of a bookable train, ferry or carrier product.

The purpose of the plan is to expose the transfer points. A short first leg can still determine whether a longer connection is possible. Write down the cargo boundary, equipment assumptions and the action required if the intended connection cannot be used. A combined transit allowance cannot answer those questions for the parties involved.

Six decisions before the handover.

  1. 01

    Mark the three boundaries

    Separate collection, the connecting movement and final delivery. Assign one owner to each handover rather than leaving responsibility between modes.

  2. 02

    Review equipment compatibility

    A real provider must confirm the unit, dimensions and terminal handling. The demo does not infer rail acceptance from a road-cargo entry.

  3. 03

    Set the connection assumptions

    Record the intended transfer and a contingency question. The displayed range is an illustrative allowance and not a timetable.

  4. 04

    Check the transfer record

    Keep count, condition and release information available at the mode change. Missing information should trigger a review before onward dispatch.

  5. 05

    Plan a missed connection

    State who reviews the receiving date and informs the next party. Do not present an alternative departure as confirmed when it has not been checked.

  6. 06

    Confirm final access

    The last road leg still needs a delivery slot and unloading method. Terminal arrival is not permission to deliver to a site.

What the brief makes visible.

Visible transfer points

The chain shows where information and responsibility change.

Equipment questions exposed

A mode label cannot hide an unconfirmed handling requirement.

A contingency owner

A missed connection has a defined decision to make.

A coherent receiving plan

The final appointment remains beside the transport allowance.

Comparable scope

Users can distinguish a connected movement from a road-only example.

No hidden schedule claim

Every displayed day range is clearly an illustrative planning input.

Before you plan.

Is the example a real rail service?

No. It is a fictional planning connection between the named city nodes and does not identify an operator or actual departure.

Can I reverse the lane?

Not automatically. Only the authored direction has a preview. Reverse movement remains an enquiry requiring its own connection assumptions.

Are emissions calculated?

No. The site explains the information needed for a scoped comparison and does not infer emissions from a mode label alone.

What happens if a connection is missed?

The local brief flags the need to review the receiving window. It does not obtain an alternative service or notify any party.

Can unusual cargo be entered?

It can be described for a specialist enquiry, but automated timing is withheld for unsupported cargo and dimensions. No equipment approval is implied.

What does the range include?

The illustrative connected movement after departure, ending at its linehaul endpoint. Pre-collection arrangements, release and timed delivery remain separate.

Container terminal with a cargo vessel, cranes, freight train and truck.
Container terminal with a cargo vessel, cranes, freight train and truck.

Make the next decision explicit.

Prepare the enquiry